The vehicle work principle is that put the cement of body outsides
into the body inside auto-inlet.
Bulk cement delivery tanker auto-inlet
The vehicle have distinction installed nagative pressure (cement
adsorption)and position pressure (take away)two sets of system,in
the process of cement adsorption in order to protect equipment
normal using and operator safety,please strict requestion operation
as follow:
1、Open power remover
After starts the vehicles,which keep the engine idle speed
(600-800r/min),then footswitch clutch and open the most left
electromagnetic switch of cab,then slowly loosen footboard of
clutch,air blower begin work.Engine rev can adjusted through
speeder pistol grip control.
Note:
⑴ When the work of negative pressure, please make sure that
all close of charging box cover , inlet valve, vane type shutter
and outlet valve;
⑵ The power remover system do not peg stall!!!
2、Pipe alley valve control
The first step: When the work of suction aggregate (negative
pressure),it is must make sure air blower and gas check of body
pipeline are both open[See the chart:valve1];
The second step: Close two inlet valve of (positive pressure)
air compressor inlet pipeline connect with (forward and backward
silo)[see the chart:valve4 and valve5]
The third step: Close the two vane type shutter of (forward
backward silo )take away pipeline.[See the chart: vane type
shutter 6 and vane type shutter 7 ], so that prevent to damage
air compressor system equipment.

3、Suction aggregate control
Make sure that start work of air blower, whose operator can
control the speed of suction aggregate reference two set of
vane type shutter are installed the top of backward silo and
rear part of vehicle.[See the chart 1 and chart 2]

4、Close suction aggregate system
When the silo have fulled,please close the system as follow:
The first step : Footswitch clutch , close the most left electromagnetic
switch of the cab,then slowly loosen footboard of clutch and
close power remover;
The second step : Close the ball clack 1 and vane type shutter
3 of suction
aggregate pipeline;[See left chart and see right chart ]

The third step :Open the two inlet valve of positive pressure
system[See the chart:valve 4 and valve 5 ],so prepare take away.

5、Items to specially noted
A. We suggest that gear oil in the air blower
need to change each month and apply model GL-5(85W/90)
B. In order to protect safety of equipment
and driver in an all-roumd way, our company have installed safety
equipment in the design process, but we suggest that operator
must understand and familiar working instruction, so that guarantee
vehicle and vehicular equipment working efficiently.
C. Check and maintenance filtering apparatus
each week;
D. Rubber pipe are installed in negative
pressure pipeline is that check and maintanence before each
using.
E. When the work of suction aggregate system,the
negative pressure strict control within the 0.01, otherwise,
the body will serious damage or deformation (we suggest that
do not full close the vane type shutter of vehicle rear parts)
|